New Construction Includes Interior Wall Preparation
As
the new
construction on our house progresses with the exterior vinyl siding
complete, drywall contractors moved in to get the interior walls in place and
ready for the next phase of priming, texturing and painting the new walls. The
interior studs have been in place for quite a while, insulation was rolled and
blown in, and then the next step was to install drywall. We were out at the
house one day when all the sheet rock was delivered and placed in each area of
the house. We thought putting the drywall up would be completed over several
days, but we were pleasantly surprised to get to the house the next day to find
all the drywall up.
All
of a sudden we could visualize each room with the walls in place. And, the
house was beginning to really take shape. We were very happy with the results.
Our visions, plans and dreams of a house on the lake are beginning to take on a
new look with interior walls.
After
the drywall was in place, subcontractors came in to tape and mud the walls. After
the initial tape and mudding, a second application was applied. After each tape
and mudding application was complete, the subs sanded the drywall to provide a
smooth surface so the walls could be textured. This was a messy process where
the workers each wore masks for safety to prevent inhaling dust from the
drywall.

Labels: Arkansas, Blue Moon Bay Builders, construction, Diamondhead, energy efficient, high energy efficiency, Hot Springs, lake living, new construction, relocation, retirement